Implementation Process

Nonterritorial Foundation manages installation from initial assessment through activation: Phase 1: Identification of Potential Space Site assessment evaluating acoustic properties, architectural constraints, and institutional needs. Phase 2: Technical Parameters Detailed specification for acoustic treatment, speaker configuration, lighting, and control systems. Phase 3: Economic Parameters Customized cost structure including one-time installation expenses and ongoing annual access fees. Phase 4: Acoustic Preparation Creating an acoustically prepared space with equipment and settings. Phase 5: Installation and Programming Precise tuning of audio systems, initial programming load, staff training, and activation. Installation typically requires eight to twelve weeks.