Nonterritorial Foundation manages installation from initial assessment through activation:
Phase 1: Identification of Potential Space
Site assessment evaluating acoustic properties, architectural constraints, and institutional needs.
Phase 2: Technical Parameters
Detailed specification for acoustic treatment, speaker configuration, lighting, and control systems.
Phase 3: Economic Parameters
Customized cost structure including one-time installation expenses and ongoing annual access fees.
Phase 4: Acoustic Preparation
Creating an acoustically prepared space with equipment and settings.
Phase 5: Installation and Programming
Precise tuning of audio systems, initial programming load, staff training, and activation.
Installation typically requires eight to twelve weeks.
← Back to Index